![]() The property owner is legally required to maintain their site in a safe condition, which includes hiring construction professionals to perform housekeeping work at the site. The tower construction site at 45 Place is under a Full Stop Work Order, which has been in effect since December 2019 when the contractor of record withdrew from the project. ![]() The Department of Buildings filled me in last December (I know, always behind!) and here’s the rundown on the site and the crane: She has also recorded what looks like construction materials falling off the building. She followed up a couple months later, when she a moving elevator and some activity there, but I think that’s probably the last time there was any action. Does anyone, any city agency inspect it?” It hasn’t been operational in over two years, probably closer to three. wrote to ask: “The crane on top of 45 Park Place looks like it is falling apart.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |